๐ฅ๐ฎ๐ฝ๐ถ๐ฑ ๐ง๐ฟ๐ฎ๐ป๐๐ถ๐ ๐ฆ๐๐๐๐ฒ๐บ ๐ก๐ผ๐ฟ๐๐ต๐ฒ๐ฟ๐ป ๐๐ฝ๐ฝ๐ฟ๐ผ๐ฎ๐ฐ๐ต ๐ฅ๐ผ๐ฎ๐ฑ (๐ฆ๐ฒ๐ฐ๐๐ถ๐ผ๐ป ๐)
The proposals for Colchester’s new Rapid Transit System (RTS) across the borough will start to come to fruition from the week commencing 16th January when Colchester and Essex Councils begin work on the scheme.
This phase of the RTS will implement a segregated bus lane from/to the A12 from/to the centre (and eventually beyond) and will also see a segregated cycle lane and pedestrian infrastructure, as well as green spacing. The initial works will prepare for this first phase. There will be traffic management in place during this period up until end of February (not closures), although this is limited to 10am-3pm to avoid peak travel time.
The mature trees along the NAR (yellow storage side) will mostly be removed with the promise of some being replaced and some of the mature trees being replanted.
Click below for full details of the plans
https://www.essexhighways.org/highway-schemes-and-developments/highway-schemes/multi-district-schemes/a120-a133-link-and-rapid-transit
https://d0cs.colchester.gov.uk/Publisher/mvc/listDocuments?identifier=DC&ref=222144